Systems / Off Shore / Mega Packer Expander

Operation

  • Run in hole to desired depth straddling the packers over the intended stim zone.
  • Circulate through the VCV at specified rate.
  • Activate Packers by flowing at specified rate to close VCV & within the rate window for zonal stimulation.
  • To deactivate packers, simply kick out the pumps. The packers will retract to their original position.
  • Allow time for annular equalization and pull to the next stage.
  • Repeat Activation, Stimulation, and Deactivation sequence for all intended zones.
  • When stages are complete, pull out of hole.

Bottom hole assembly

Mega Packer Expander bottom hole assembly, top to bottom
  1. Mechanical Set Packer

    Tension or Rotaionally set

TALK TO AN EXPERT