CASE STUDIES

AUSTRALIA

On Saturday the 10th to the 11th of August 2018, Lee Energy Systems in conjunction with their representatives R&D Solutions who are based in Perth Western Australia, successfully ran the first casing cut operations in Australia for Cooper Energy on Sole-2, an offshore Abandonment near Victoria Australia using the ‘Gator Tool’ in 9 5/8” casing.

UNITED KINGDOM

By utilising the Gator Perforator System, Shell UK completed multiple Casing Perforations over 3 subsea wells.The system and perforations provided allowed for the Cement Environmental plugs to be set in the shortest time recorded in the North Sea.